Addressing Retaining Wall Failures: A Case of NYC

Retaining wall failures can pose significant safety risks and lead to costly damages, particularly in a dense urban environment like New York City. Knowing how to respond after a failure is critical to minimizing hazards, ensuring compliance with local laws, and restoring stability. This guide outlines the essential steps to address retaining wall failures effectively in NYC.

Immediate Actions After a Retaining Wall Failure

1. Ensure Public Safety

  • Evacuate the Area: If the failure occurs near residential or public spaces, clear the area immediately to prevent injuries.
  • Install Temporary Barriers: Use fencing, warning tape, or barriers to restrict access to the site.
  • Notify Authorities: Contact NYC’s Department of Buildings (DOB) by calling 311 to report the incident and begin official documentation.

2. Engage Qualified Professionals

  • Hire a Qualified Retaining Wall Inspector (QRWI): A licensed structural engineer can assess the damage and classify the wall's condition as Unsafe under Local Law 37.
  • Consult Contractors: Bring in specialized contractors experienced in retaining wall repairs to assist with stabilization and debris removal.

Assessing the Damage

Structural Analysis

  • Inspect the Foundation: Evaluate the stability of the base and determine if the failure has compromised adjacent structures.
  • Identify Contributing Factors: Analyze drainage issues, soil erosion, or construction defects that may have led to the failure.
  • Prepare a Condition Assessment Report: A detailed report from the QRWI is required, including photos, diagrams, and repair recommendations.

Safety Measures

  • Temporary Supports: Install shoring or bracing to prevent further collapse while repairs are being planned.
  • Drainage Controls: Implement measures to redirect water away from the site, such as temporary pumps or diversion channels.

Filing Reports and Complying with NYC Regulations

Submit a Notification of Unsafe Condition

Under Local Law 37, property owners must submit a Notification of Unsafe Condition to the DOB within 24 hours of discovering the failure. This notification should include details about the collapse and proposed safety measures.

Obtain Permits for Repairs

  • Hire a Registered Design Professional: A professional engineer or architect must prepare and submit repair plans to the DOB for approval.
  • Apply for Necessary Permits: Depending on the repair scope, permits may be required for excavation, structural work, or drainage improvements.

Restoring the Retaining Wall

1. Design and Planning

  • Customized Repair Plans: Ensure the new design addresses the root causes of the failure, such as inadequate drainage or improper loading.
  • Material Selection: Use durable, weather-resistant materials that comply with NYC standards.

2. Construction

  • Adhere to Approved Plans: Follow the DOB-approved design to avoid future violations or failures.
  • Supervised Execution: Ensure licensed contractors and special inspection agencies oversee the repair process.

3. Post-Repair Steps

  • Submit an Amended Report: Once repairs are complete, the QRWI must inspect the wall and file an amended report with the DOB, certifying the structure as Safe.
  • Regular Maintenance Plan: Schedule periodic inspections and maintenance to prevent future issues.

Retaining wall failures require swift action and compliance with NYC regulations to ensure safety and stability. By engaging qualified professionals, addressing root causes, and adhering to Local Law 37, property owners can restore structural integrity and minimize future risks.


In NYC’s high-density environment, being proactive after a retaining wall failure not only safeguards lives but also reinforces the resilience of urban infrastructure.

Share this post
Resources

Latest Resources

Communities & Memberships

New York City

Department of
Buildings

New York City

Landmarks Preservation Commission

New York City

Department of
Protection

New York City

Department of
Transportation

New York City

Fire Department

New York City

Office of Administrative Trials and Hearings

We look forward to partnering with you on your next successful project!

Together, let’s build safer, stronger, and more compliant spaces that stand the test of time. Partner with Parapet Engineering to ensure your project’s success—every step of the way.