Do you know you could be fined $5000 annually?
Schedule Local Law 126 Inspection
Resources
Downloadable Resources

NYC Drawing Standards: A Guide to Compliance

The Drawing Standards for Plan/Work Applications document provides a detailed checklist to ensure all submissions meet NYC Department of Buildings (DOB) requirements for plan examination and approvals. Adhering to these guidelines facilitates smooth project approvals and compliance.

Key Highlights:

  • Submission Requirements: Initial filings require unbound sets of plans with wet ink signatures and stamps. Specific requirements vary based on the project type.
  • Drawing Standards: Plans must include a north arrow, clear labels, dimensions, and distinctions between new and existing construction.
  • Title Block Standards: Each drawing must include critical details like project name, DOB identification number, registered design professional’s information, and space for DOB stamps.
  • Revisions and Amendments: Post-approval amendments must be clearly marked and aligned with professional practice standards.

For detailed instructions and a complete checklist, download the full Drawing Standards for Plan/Work Applications document:
Download the Drawing Standards <https://www.nyc.gov/assets/bsa/forms/guidelines-for-drawings-january_2022.pdf>

Ensure your submissions meet NYC’s exacting standards for a seamless approval process.

Share this post
Resources

Latest Resources

Communities & Memberships

New York City

Department of
Buildings

New York City

Landmarks Preservation Commission

New York City

Department of
Protection

New York City

Department of
Transportation

New York City

Fire Department

New York City

Office of Administrative Trials and Hearings

We look forward to partnering with you on your next successful project!

Together, let’s build safer, stronger, and more compliant spaces that stand the test of time. Partner with Parapet Engineering to ensure your project’s success—every step of the way.